This is a short summary of some issues we found needed addressing after Comp 2025 and how we plan on fixing them next year.

Cells

    Cells might have gotten too hot — could be bad thermistors, but either way the thermistor data shows a clear upward trend, meaning we ran hotter than we’d like

    Tim pointed out we’re drawing a much higher percentage of the discharge rating than before

    Might be worth switching to cells with higher continuous discharge ratings

    Conclusion:

      8p36s configuration with molicel p50b best for longevity of future packs. This way there is no need to change s,p configuration considering extremely high discharge current and max voltage of MC.

      Re-test thermistors to confirm accuracy or buy new ones

      Second Story

        Some boards have odd bases and inconsistent enclosures

        We should work with electrical to design one proper enclosure that fits everything

        This would let us move the battery pack contactors up to the second story

        Would also free up more space for better cell layout, leaving only fuse with the cells

        Cleaner wire harnessing becomes easier with one shared structure

        Conclusion:

          Make the electrical assembly plate/box easily removable

          Ask electrical for a full wiring schematic of the assembly to plan out wiring harnessing 

          Two-StoryModule Design

            Module compression needs to be more reliable — more screws or better retention

            Thermistors need defined placement, possibly inside the cell holders

            Make voltage taps more accessible

            Improve general wiring management

            Maybe include wire clips in railing design 

            Use Amphenol connectors to avoid relying on direct busbar connections

            Machine modules from Delrin for higher flexural modulus

            Testing

              Plan timeline to include testing for next year. We don't want to be assembling the modules for the first time during June

              Get full discharge/charge curves to better estimate SOC starting on current pack and ideally on next pack before ASC 2026

              Get a better cell tester to fully characterize next cells